  







Used work stand material category list |
Main pole
Bracket
Hanging over bracket
Handrail
Footplate (mesh)
Truss
Side adapter
Centre adapter
Soleplate (plastic)
Soleplate (steel)
Soleplate (for under the roof)
Fixed jack base
Universal jack base
Horizontal wall support jack
Jack holder
Locking pin
Aluminum staircase
Steel staircase
Bracing
Batter pipe
Orthogonal clamp
Universal clamp
Wire mesh sheet
Horizontal wall connector
|
Torii style frame
Simple style frame
Ladder style frame
Adjustment frame
Steel scaffolding board
Auxiliary scaffolding board
Bracing
Steel staircase(inch)
Steel staircase(metre)
Aluminum staircase(inch)
Aluminum staircase(metre)
Vertical lock
Jack base
Jack
Fixed base
Handrail (prevention of fall)
Handrail
Supporter
Connecting pin
Handrail pole
Caster
Truss
Batter brace
Sliding bracket
Steel scaffolding board
Aluminum scaffolding board
Chipboard scaffolding board
|
Bracket 900
Bracket600
Bracket500
Short bracket
Collapsible bracket
Footboard400
Footboard270
Footboard240
Truss with clamp 1800
Truss with clamp 1350
Truss with clamp 900
Truss with clamp 600
Truss with clamp 500
Fixed base
Whirligig base
Whirligig jack base
Steel staircase
Aluminum staircase
Truss
Truss support
Ladder
Steel scaffolding board
Aluminum scaffolding board
Batter pipe connecter
Universal/orthogonal catch clamp
Universal clamp
Orthogonal clamp
Sheet clamp
Three consecutive universal clamp
Straight joint
Batter pipe
Wire mesh sheet
Horizontal wall connector
|
|
Handling manufactures'list |
|
Shinwa Co.Ltd
Sankyo Co.Ltd
Daisan Co.Ltd
Alinco Co. Ltd.
Koyo machine industry Co. Ltd.
Holly Co. Ltd.
Yuhara industry Co. Ltd.
Itech Co. Ltd.
Heiwa Giken Co.Ltd
|
|
|
|
* Basic flow until purchase
- Application by the contact form, phone or fax.
- Scheduling of evaluation date.
- Quotation based on images sent by E-mail or evaluation trip.
- Request for purchase.
- Item pick up and inspection.
- Contract(final price).
- Payment(It is made 3~7days after pick up).
|
* Payment within 10 days
We provide a quotation after evaluating the customer's scaffolding items. If the customer is satisfied with it, we will pick up the items and inspect them. Then we will provide the final price and contract.
We can make payment as fastest as within 10days from an enquiry to payment.
|
* Items we are interested in
Kusabi kinketsushiki / Wedge combined scaffolding( Shinwa, Daisan, Sankyo, Alinco, KYC, Yuhara etc.)
Batter pipe, horizontal wall connector, clamp, special clamp, frame, footboard, bracing, frame for staircase, jack base, soleplate, handrail, handrail installed earlier, joint, bracket, truss, steel scaffolding board, aluminum scaffolding board, items for rolling tower, caster, safety wall, caster gate, panel gate etc.
|
|